ZIBI BLOCK 2-3

Masonry Restoration

Gatineau, QC

The scope of work was to restore the foundations, exterior and interior of the block 2-3 industrial brick buildings located at the midpoint of the Eddy and Booth street bridge linking Ottawa and Gatineau.


The 5 wythes brick structure needed numerous full depth rebuilding, temporary shoring and repointing. Close to 50 000 bricks were replaced including the core of the structure.


Also, we removed 100% of the contaminated paint on the perimeter of the building using abrasive and chemical products.

COÛT DU PROJET:

CLIENT: 

DATE D'ACHÈVEMENT:

$2 200 000

2019

John G. Cooke & Associates Ltd.